Home
International Journal of Science and Research Archive
International, Peer reviewed, Open access Journal ISSN Approved Journal No. 2582-8185

Main navigation

  • Home
  • Past Issues

AI-powered project scheduling systems: Enhancing construction timelines with real-time resource allocation and delay prediction analytics

Breadcrumb

  • Home
  • AI-powered project scheduling systems: Enhancing construction timelines with real-time resource allocation and delay prediction analytics

Adebayo Shodunke *

Quantity Surveying, University of Lagos, Nigeria.

Research Article

International Journal of Science and Research Archive, 2025, 16(01), 049-068

Article DOI: 10.30574/ijsra.2025.16.1.1950

DOI url: https://doi.org/10.30574/ijsra.2025.16.1.1950

Received on 18 May 2025; revised on 22 June 2025; accepted on 25 June 2025

The construction industry is renowned for its complexity, time sensitivity, and frequent schedule overruns due to dynamic variables such as labor availability, weather conditions, resource delays, and project interdependencies. Traditional project scheduling tools, such as Gantt charts and Critical Path Method (CPM), often fall short in adapting to real-time changes and forecasting disruptions with sufficient accuracy. In response to these challenges, artificial intelligence (AI)-powered project scheduling systems are emerging as transformative tools, offering dynamic and data-driven solutions for managing construction timelines. These intelligent systems leverage machine learning algorithms, historical project data, and real-time site inputs to optimize resource allocation, identify potential schedule conflicts, and predict project delays before they occur. This article explores the conceptual framework, architecture, and operational mechanisms of AI-powered scheduling systems in construction project management. It begins with an overview of the limitations of traditional scheduling methods, followed by a detailed examination of how AI models—including reinforcement learning, predictive analytics, and natural language processing—are employed to enhance timeline reliability. The paper further delves into integration with Building Information Modeling (BIM), IoT-enabled site monitoring, and ERP systems for cohesive planning and execution. Real-world case studies and simulation results are presented to demonstrate the improvement in schedule adherence and resource efficiency. By embedding AI into the project lifecycle, stakeholders gain access to adaptive scheduling platforms that not only react to change but also anticipate disruptions proactively. This shift from reactive to predictive scheduling marks a significant step toward improving construction productivity, minimizing financial risks, and ensuring timely project delivery.

Artificial Intelligence; Project Scheduling; Construction Management; Delay Prediction; Resource Allocation; Real-Time Analytics

https://journalijsra.com/sites/default/files/fulltext_pdf/IJSRA-2025-1950.pdf

Preview Article PDF

Adebayo ShodunkeAI-powered project scheduling systems: Enhancing construction timelines with real-time resource allocation and delay prediction analytics. International Journal of Science and Research Archive, 2025, 16(01), 049-068. Article DOI: https://doi.org/10.30574/ijsra.2025.16.1.1950.

Copyright © 2025 Author(s) retain the copyright of this article. This article is published under the terms of the Creative Commons Attribution Liscense 4.0

Footer menu

  • Contact

Copyright © 2026 International Journal of Science and Research Archive - All rights reserved

Developed & Designed by VS Infosolution